It's been a long and busy construction season!  Most aspects of the job have gone smoothly but there have been a couple hangups.  The biggest so far is the poles used to support the overhead "Meter On" signs.  Not installed often, the normally highly reliable vendor failed their on-site inspections twice and delivered the poles much later than anticipated.  Then another exceptionally long delay with one small component, the U-bolts that hold the signs to the poles.  The other constant headach...
Continue reading ...